Services
Drying services for Christchurch builders & renovators
Every service is delivered with documented moisture readings, BRANZ- aligned methods and a programme that respects your trades.
For BuildersNew Build Drying
Accelerated structural drying for new builds — slabs, framing, plaster and insulation — so your trades stay on schedule.
Learn more
For BuildersRenovation Drying
Drying support for renovations — bathroom waterproofing, kitchen rip-outs, leak rectifications and re-clads.
Learn more
For BuildersConcrete Slab Drying
Drive slab moisture down to flooring spec — and prove it with documented readings.
Learn more
For BuildersPlaster & Paint Drying
Drive plaster, skim and paint to recoat-ready in hours, not days.
Learn more
For BuildersFraming Moisture Testing
Pre-line moisture verification so you can close walls with confidence — and a paper trail.
Learn more
For BuildersWater Damage Support
When water finds its way in — fast extraction, drying and documentation so you can pick up where you left off.
Learn moreNZ standards & compliance
NZS 3604 moisture targets, NZBC E2/E3/B2, HSWA and IICRC S500 — the standards behind every documented dry-out.
See the standardsEquipment & capability
LGR and desiccant dehumidifiers, air movers, moisture meters and cavity drying — the gear behind a fast, documented dry-out.
See the equipmentFAQ
Standards & compliance FAQs
What moisture content does timber framing need to be before lining?
Under NZS 3604:2011, sawn pine framing must be at or below 18% moisture content when linings are fixed (16% for LVL). Lining over wetter framing is a Building Code breach and a weathertightness risk. We take pin-meter readings at marked locations and issue a signed report before your lining trade starts.
Which Building Code clauses apply to structural drying?
E2 (external moisture) and E3 (internal moisture) govern keeping water out and managing internal dampness; B2 (durability) is compromised if materials are closed up wet; F2 covers hazardous materials such as asbestos. Our drying and reporting are built around returning the structure to E2/E3 compliance and protecting B2 durability.
Are your methods BRANZ and IICRC aligned?
Yes. Our technicians work to IICRC S500 (the global structural-drying standard) and our target thresholds are BRANZ-aligned. That's the methodology and credibility your BCA, QS and insurer expect to see.
What about asbestos on older renovations?
Buildings before 1990 commonly contain asbestos in linings, textured ceilings and floor tiles. We don't disturb suspect material — we flag it and recommend a licensed survey under the Asbestos Regulations 2016, then dry around it. Disturbing ACM without a survey is a serious WorkSafe breach.
Do you provide documentation for insurers and the council?
Every job comes with moisture mapping, dated daily logs and a completion report confirming the structure reached target moisture before reinstatement — the evidence insurers, EQC and BCAs require, and what protects a claim from being reduced for failure to mitigate.
Got a build that needs drying?
Talk to the only Christchurch drying crew that quotes on your programme, not against it.