Resources
Structural drying guides for builders
Straight answers on moisture, standards and the drying process — written for the people who have to close the wall.
5 min read
Timber framing moisture targets under NZS 3604 (and why 18% matters)
The single number that decides whether you can line a wall in NZ — what NZS 3604 requires, how it's measured, and what happens if you close up wet framing.
Read guide6 min read
How structural drying actually works on a Christchurch build
Extraction, dehumidification, airflow and heat — the four levers of structural drying, and how we balance them to dry your build fast without warping finishes.
Read guide6 min read
The drying gear we run on site — and why each piece matters
LGR vs desiccant dehumidifiers, snail-fan air movers, cavity injection and floor mats. A plain-English guide to the equipment behind a fast, documented dry-out.
Read guideGot a build that needs drying?
Talk to the only Christchurch drying crew that quotes on your programme, not against it.